Procurement Request
Maintenance of Canopy at Existing Working Area, Port of Ormoc, Ormoc City |
992,718.34 | Quotation | Quotation |
Procurement of Service Provider for CY 2026 Re-Appraisal of Port Property, Plant and Equipment (PPE) |
15,000,000.00 | Quotation | ||||
Procurement of Service Provider for the Online Conduct of Root Cause Analysis Training |
307,166.00 | Quotation | ||||
Rentals/Lease (Lighting of PPA Head Office) "2026 National Maritime Week" |
344,666.67 | Quotation |
Various spare parts for repair and maintenance of various IT equipment, PMO Palawan |
Quotation |
Facilitation of Protected Area Management Board (PAMB) Clearance, Area Clearance, Conduct of Environmental Impact Assessment (EIA) Study, Preparation of Environmental Performance Report and Management Plan (EPRMP), and Facilitation of Environmental Compliance Certificate (ECC) for the Bulado Port Expansion Project Port of Bulado, Guihulngan City, Negros Oriental |
2,249,205.00 | Quotation | Quotation | |||
Maintenance of Signage at PMO-NOS Ports |
331,147.07 | Quotation |
Repair and Replacement of Defective Devices of Existing Fire Detection and Alarm System (FDAS) |
718,032.00 | Quotation | ||||
Procurement of Services for Siphoning and Cleaning of Septic Tanks at PMO Administration Building, Port of Nasugbu, Calatagan, Tablas and Romblon |
801,684.00 | Quotation | ||||
Repair and Replacement of Defective Devices of Existing Fire Detection and Alarm System (FDAS) |
718,032.00 | Quotation | ||||
Repair of Various Airconditioning Units at PMO Batangas |
248,528.00 | Quotation |
Preventive Maintenance of 2MVA Cast Resin Transformer at Passenger Terminal Building |
500,000.00 | Quotation | Quotation | |||
Preventive Maintenance of 1 MVA Caterpillar Generator at Powerhouse |
390,00.00 | Quotation | Quotation | |||
Preventive Maintenance/Inspection and Diagnosis of HVAC Systems 1G, 2G and 3G at the Passenger Terminal Building, Port of Cagayan de Oro |
420,000.00 | Quotation | Quotation | |||
Preventive Maintenance of 3x167kva Transformer at Transformer Vault |
600,000.00 | Quotation | Quotation |
Procurement of additional Petroleum Fuel (Diesel & Gasoline) for PMO-SOCSARGEN service vehicles and other motorized equipments for CY 2026 (2nd Half) (see attached TOR and List of Motorized Vehicles/Equipments |
1,259,940.00 | Quotation | Quotation | |||
Supplies for the Preventive Maintenance of Generator Sets, Port of General Santos |
226,349.96 | Quotation | Quotation | |||
Supply of labor and Materials/Equipment for the Maintenance of Lateral Drainage Concrete Pavement and Installation of Gutter at Passenger Terminal Building, Port of San Mabila |
351,076.00 | Quotation | Quotation |
Maintenance of Port Integrated Clearing Office Building at Nasipit Port |
997,280.00 | Quotation | ||||
Maintenance of Port Operations Building at Nasipit Port |
998,103.00 | Quotation |
