|
Minutes of Meeting During the Pre-Bid Conference on (1) Emergency Repair of Pier Approach and Repair/Replacement of Fendering System, Port of Dapitan, Dapitan City, and (2) Repair/Replacement of Damaged M-Type, Rubber Dock Fenders, Port of Dapitan, Dapitan City
|
|
|
|
|
|
|
|
|
|
Supply, Delivery and Installation of Seventeen (17) ACU and Six (6) Air Curtain Units at the Port of Dapitan and Port of Sindangan.
|
|
|
|
|
|
|
|
|
|
Supply of Labor and Materials for the Printing and Design of 170pcs Polyester Drifit Sportsfest Uniform, Full Sublimation,V-neck, High Quality PMO ZDN, Port of Dapitan
|
|
|
|
|
|
|
|
|
|
Supply and Delivery of Steel Locker, 6 Door, with Hanger Rod and Shoe Compartment, Gauge #18, with Double Security Locks in Each Door, with Ventilation Holes, with name card holder, beige color, dimension(LxWxH) 900MM x 450MM x 1850MM, Port of Dapitan, Dapitan City
|
|
|
|
|
|
|
|
|
|
Minutes of Meeting During the Pre-Bid Conference on Procurement of Supply, Delivery and Installation of Seventeen (17) Air Conditioning Units and Six (6) Air Curtain Units at Port of Dapitan and Port of Sindangan
|
|
|
|
|
|
|
|
|
|
Pre-Bid Conference of Supply, Delivery and Installation of 17 Air Conditioning Units and 6 Air Curtain at Port of Dapitan and Port of Sindangan, PMO Zamboanga del Norte / Dapitan.
|
|
|
|
|
|
|
|
|
|
Supply , Delivery and Installation of Public Address System req.by Finance Division, Port of Dapitan, Dapitan City
|
|
|
|
|
|
|
|
|
|
Supply of Labor, Tools, Materials, and Equipment for the conduct of Repair of Damaged RC Curb along RC Pier, Port of Dapitan, Dapitan City, Zamboanga del Norte
|
|
|
|
|
|
|
|
|
|
Replacement of RDF Bolt, RIP-RAP and pavement, Bulkhead and Entrance/Exit Gate, Port of Sindangan, ZDN
|
|
|
|
|
|
|
|
|
|
Procurement of Toners for Develop INEO 221 Photocopier not available in PS-DBM for the 1ST Quarter CY 2019 of PMO ZDN, Port of Dapitan, Dapitan City, Zamboanga del Norte
|
|
|
|
|
|
|
|
|
|
Procurement of Engineering Division Office Supplies Not Available in PS-DBM for the 1st Quarter CY 2019 of PMO ZDN, Port of Dapitan, Dapitan City, Zamboanga del Norte
|
|
|
|
|
|
|
|
|
|
Procurement of Office Supplies Not Available in PS-DBM fot the 1st Quarter CY 2019 of PMO ZDN, Port of Dapitan, Dapitan City, Zamboanga del Norte
|
|
|
|
|
|
|
|
|
|
Supply of Labor, Tools and Equipment for the Upgrading and Transfer of CCTV Control/Monitoring to the New PPD Bldg., PMO ZDN, Dapitan City, Zamboanga del Norte
|
|
|
|
|
|
|
|
|
|
Supply, Delivery and Installation of Badminton Rubber Mat and Its accesories at 3rd Floor, Multi-purpose GAD Hall, Adminstration Bldg., PMO-ZDN, Port of Dapitan, Dapitan City, Zamboanga del Norte
|
|
|
|
|
|
|
|
|
|
Supply, Delivery and Installation of Roll-up Blinds, at the 3rd floor Multi-Purpose GAD Hall, Administration Bldg. PMO-ZDN, Port of Dapitan, Dapitan City, Zamboanga City
|
|
|
|
|
|
|
|
|
|
Application of Waterproofing and Bitumen Fill Surrounding the GAD Hall and Replacement of Damaged Ceiling Boards at Finance and COA, Provision of Working Area and Additional Stainless
Steel Tank for PTOB, Port of Dapitan, Dapitan City, ZDN
|
|
|
|
|
|
|
|
|
|
Fabrication of Pedestrian Covered Walkway at East-Side of Port, Port of Dapitan, Dapitan City, ZDN
|
|
|
|
|
|
|
|
|
|
Fabrication of Cubicle with Table Top, Shelves, and Drawer at ESD and Rewiring of Electrical and LAN outlet at ESD, Finance, Admin and Conference Room, Port of Dapitan, Dapitan City, Zamboanga Del Norte
|
|
|
|
|
|
|
|
|
|
Procurement of ECC Application for the Proposed Extension of RC Pier and all other Future Infrastructure Projects in the Port of Sindangan
|
|
|
|
|
|
|
|
|
|
Procurement of WIFI Facility with Wired Internet Connectivity of PMO Zambo.del Norte/Dapitan for CY 2019-2020
|
|
|
|
|
|
|
|
|